Triple

T4671447
Position Surface form Disambiguated ID Type / Status
Subject Southern Railway (UK) E102970 entity
Predicate operating period P802 FINISHED
Object interwar period LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: interwar period | Statement: [Southern Railway (UK), operating period, interwar period]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: operating period
Context triple: [Southern Railway (UK), operating period, interwar period]
  • A. operatedDuring chosen
    Indicates that an action, process, or system was functioning or in operation throughout a specified time period or event.
  • B. operatingCycle
    Indicates the duration or process through which an entity completes a full sequence of its operations from start to finish.
  • C. operatedFor
    Indicates that one entity performed operations or provided services on behalf of, or in support of, another entity for a certain period or purpose.
  • D. operatedAt
    Indicates that an operation, procedure, or activity was performed at a specific location or facility.
  • E. operatedUntil
    Indicates that an entity continued to function or be in operation up to a specified end time or date.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd43d9cba4819086c1ab1c2d9d2133 completed March 20, 2026, 12:55 p.m.
NER Named-entity recognition batch_69bd655aceb081908100ffc0498fe183 completed March 20, 2026, 3:18 p.m.
PD Predicate disambiguation batch_69bd6215864c8190b50ba0f63ba87d0c completed March 20, 2026, 3:04 p.m.
Created at: March 20, 2026, 1:15 p.m.