Triple

T4671434
Position Surface form Disambiguated ID Type / Status
Subject Southern Railway (UK) E102970 entity
Predicate electrification system P5320 FINISHED
Object 750 V DC third rail LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 750 V DC third rail | Statement: [Southern Railway (UK), electrification system, 750 V DC third rail]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: electrification system
Context triple: [Southern Railway (UK), electrification system, 750 V DC third rail]
  • A. electrificationSystem chosen
    Indicates the type of electrical power system used to supply energy (typically to infrastructure or vehicles) for operation.
  • B. electrification
    Indicates the process or state of providing electrical power or converting something to operate using electricity.
  • C. electricalSystem
    Indicates that one entity functions as, is part of, or is directly related to the electrical system of another entity.
  • D. electrificationEnd
    Indicates the point in time or event at which an electrification process or electrified state comes to an end.
  • E. electrificationCompleted
    Indicates that the process of providing electrical power infrastructure to the relevant entity or area has been fully completed.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd43d9cba4819086c1ab1c2d9d2133 completed March 20, 2026, 12:55 p.m.
NER Named-entity recognition batch_69bd655aceb081908100ffc0498fe183 completed March 20, 2026, 3:18 p.m.
PD Predicate disambiguation batch_69bd6215864c8190b50ba0f63ba87d0c completed March 20, 2026, 3:04 p.m.
Created at: March 20, 2026, 1:15 p.m.