Triple

T4669235
Position Surface form Disambiguated ID Type / Status
Subject Wilson Dam E102920 entity
Predicate hasPowerPlant P9904 FINISHED
Object Wilson Dam Powerhouse E102920 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Wilson Dam Powerhouse | Statement: [Wilson Dam, hasPowerPlant, Wilson Dam Powerhouse]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Wilson Dam Powerhouse
Context triple: [Wilson Dam, hasPowerPlant, Wilson Dam Powerhouse]
  • A. Wilson Dam chosen
    Wilson Dam is a large hydroelectric and navigation dam in northern Alabama that forms part of the Tennessee Valley Authority system on the Tennessee River.
  • B. Watts Bar Dam
    Watts Bar Dam is a Tennessee Valley Authority hydroelectric and navigation dam on the Tennessee River in eastern Tennessee.
  • C. Moses–Saunders Power Dam
    The Moses–Saunders Power Dam is a large binational hydroelectric generating station on the Saint Lawrence River jointly operated by the United States and Canada.
  • D. High Rock Dam
    High Rock Dam is a hydroelectric dam in North Carolina that impounds the Yadkin River to form High Rock Lake, a major reservoir for power generation and recreation.
  • E. La Grange Dam
    La Grange Dam is a historic diversion dam on California’s Tuolumne River that supplies irrigation water to agricultural lands in the San Joaquin Valley.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd43d9cba4819086c1ab1c2d9d2133 completed March 20, 2026, 12:55 p.m.
NER Named-entity recognition batch_69bd6340ce548190bd436c59f28227d7 completed March 20, 2026, 3:09 p.m.
NED1 Entity disambiguation (via context triple) batch_69be038c89f88190aad42cb6974bec2c completed March 21, 2026, 2:33 a.m.
Created at: March 20, 2026, 1:15 p.m.