Triple

T4635404
Position Surface form Disambiguated ID Type / Status
Subject Plymouth Breakwater E101517 entity
Predicate instanceOf P0 FINISHED
Object breakwater C3669 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: breakwater
Context triple: [Plymouth Breakwater, instanceOf, breakwater]
  • A. seawall chosen
    A seawall is a coastal defense structure built parallel to the shoreline to protect land and infrastructure from wave action, erosion, and storm surges.
  • B. barrier beach
    A barrier beach is a long, narrow, offshore deposit of sand or sediment that runs parallel to the coastline, protecting the shore from waves and storms while creating sheltered waters behind it.
  • C. bridgehead
    A bridgehead is a secured position on the enemy’s side of a river or obstacle, established by advancing forces to enable further troop and supply movement.
  • D. blockade
    A blockade is a deliberate obstruction or sealing off of a place, route, or resource to prevent goods, people, or information from passing through.
  • E. movable flood barrier
    A movable flood barrier is a deployable structure designed to be raised or repositioned as needed to temporarily block or redirect water and protect areas from flooding.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd43d2f1c081908cd4b7ec48ecc73d completed March 20, 2026, 12:55 p.m.
Created at: March 20, 2026, 1:13 p.m.