Triple

T4622132
Position Surface form Disambiguated ID Type / Status
Subject Auckland Harbour Bridge E101009 entity
Predicate wideningCompletionYear P57479 FINISHED
Object 1969 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 1969 | Statement: [Auckland Harbour Bridge, wideningCompletionYear, 1969]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: wideningCompletionYear
Context triple: [Auckland Harbour Bridge, wideningCompletionYear, 1969]
  • A. originalCompletionYear
    Indicates the year in which something (such as a project, work, or construction) was first fully completed.
  • B. spireCompletionYear
    Indicates the year in which the spire of a structure was completed.
  • C. acquisitionCompletedYear
    Indicates the calendar year in which an acquisition transaction was fully completed.
  • D. endYear
    Indicates the year in which an event, state, or relationship comes to an end.
  • E. approximateYearOfCompletion
    Indicates the estimated calendar year in which something was completed, rather than an exact or confirmed year.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd43d0497c8190ac23c65c5804846a completed March 20, 2026, 12:55 p.m.
NER Named-entity recognition batch_69bd5a0374308190aeaffc9d866a3742 completed March 20, 2026, 2:30 p.m.
PD Predicate disambiguation batch_69bd5231db7c8190b38d4fdbad8bf842 completed March 20, 2026, 1:57 p.m.
PDg Predicate description generation batch_69bd56b5f4648190834eafa666d53caa completed March 20, 2026, 2:16 p.m.
Created at: March 20, 2026, 1:12 p.m.