Triple
T4620159
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | March (graphic novel trilogy) |
E100958
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | graphic novel series |
C9670
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: graphic novel series Context triple: [March (graphic novel trilogy), instanceOf, graphic novel series]
-
A.
graphic novel
chosen
A graphic novel is a long-form narrative work that tells a complete story primarily through sequential art, combining illustrations and text in a book format.
-
B.
comic strip series
A comic strip series is a sequence of related illustrated panels, typically featuring recurring characters and ongoing themes or stories, published regularly in print or digital formats.
-
C.
Marvel Comics series
A Marvel Comics series is a sequence of interconnected comic book issues published by Marvel that follows specific characters, teams, or storylines within the broader Marvel Universe continuity.
-
D.
art series
An art series is a cohesive collection of artworks created by an artist that share a unifying theme, concept, style, or technique and are intended to be viewed and understood together.
-
E.
comic strip
A comic strip is a sequence of illustrated panels, often accompanied by text, that together tell a brief, usually humorous or narrative-driven story.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69bd43cf363c819087fd5ab441b4a3f4 |
completed | March 20, 2026, 12:55 p.m. |
Created at: March 20, 2026, 1:12 p.m.