Triple

T4617429
Position Surface form Disambiguated ID Type / Status
Subject PMBOK Guide E100900 entity
Predicate edition P4629 FINISHED
Object PMBOK Guide – Third Edition E100900 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: PMBOK Guide – Third Edition | Statement: [PMBOK Guide, edition, PMBOK Guide – Third Edition]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: PMBOK Guide – Third Edition
Context triple: [PMBOK Guide, edition, PMBOK Guide – Third Edition]
  • A. PMBOK Guide chosen
    The PMBOK Guide is a globally recognized standard and reference manual published by the Project Management Institute that outlines best practices, processes, and terminology for professional project management.
  • B. ISO Technical Committee on project, programme and portfolio management
    The ISO Technical Committee on project, programme and portfolio management is the international standards body within ISO responsible for developing globally recognized guidance and requirements for managing projects, programmes and portfolios.
  • C. ISO 21500
    ISO 21500 is an international standard that provides high-level guidance and principles for effective project management applicable to organizations of all types and sizes.
  • D. ISO 31010
    ISO 31010 is an international standard that provides guidelines and a comprehensive toolkit of techniques for risk assessment within risk management frameworks.
  • E. Team Software Process
    Team Software Process is a structured software development methodology designed to help teams plan, track, and improve their engineering practices for higher quality and productivity.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd43cf363c819087fd5ab441b4a3f4 completed March 20, 2026, 12:55 p.m.
NER Named-entity recognition batch_69bd59e098c08190b769e76937dff700 completed March 20, 2026, 2:29 p.m.
NED1 Entity disambiguation (via context triple) batch_69bdfa916f4c8190a53bb37ff46ed0b5 completed March 21, 2026, 1:55 a.m.
Created at: March 20, 2026, 1:12 p.m.