Triple

T4616444
Position Surface form Disambiguated ID Type / Status
Subject ISO/IEC Directives Supplement E100879 entity
Predicate instanceOf P0 FINISHED
Object JTC 1 specific procedures C6256 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: JTC 1 specific procedures
Context triple: [ISO/IEC Directives Supplement, instanceOf, JTC 1 specific procedures]
  • A. ITU-T Recommendation
    An ITU-T Recommendation is an internationally agreed technical standard developed by the ITU Telecommunication Standardization Sector to ensure the interoperability, quality, and efficiency of global telecommunication networks and services.
  • B. ISO/IEC standard
    An ISO/IEC standard is a formally agreed-upon specification developed jointly by the International Organization for Standardization (ISO) and the International Electrotechnical Commission (IEC) that defines common requirements, guidelines, or characteristics for products, services, or systems to ensure quality, safety, interoperability, and consistency across international markets.
  • C. rules of procedure chosen
    Rules of procedure are formal guidelines that govern how decisions are proposed, discussed, and made within an organization, assembly, or legal process.
  • D. IEEE standard
    An IEEE standard is a formally documented set of technical specifications and guidelines developed and maintained by the Institute of Electrical and Electronics Engineers to ensure interoperability, safety, and quality across electrical, electronic, and computing technologies.
  • E. special procedure mandate-holders
    Special procedure mandate-holders are independent human rights experts appointed by the UN Human Rights Council to examine, monitor, advise, and publicly report on specific human rights themes or country situations.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd43cf363c819087fd5ab441b4a3f4 completed March 20, 2026, 12:55 p.m.
Created at: March 20, 2026, 1:12 p.m.