Triple

T4614922
Position Surface form Disambiguated ID Type / Status
Subject Rajkot railway division E100844 entity
Predicate instanceOf P0 FINISHED
Object railway division C13555 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: railway division
Context triple: [Rajkot railway division, instanceOf, railway division]
  • A. railroad operating division chosen
    A railroad operating division is a geographically defined segment of a railway system managed as a unit for train operations, crew assignments, dispatching, and maintenance activities.
  • B. public railway
    A public railway is a government- or publicly-owned rail transport system that provides scheduled passenger and/or freight services accessible to the general population, typically operating on standardized tracks and infrastructure.
  • C. railway line
    A railway line is a fixed transportation route consisting of tracks, signaling, and related infrastructure along which trains operate between defined locations.
  • D. railway junction
    A railway junction is a point on a rail network where two or more railway lines meet or diverge, allowing trains to switch between different routes.
  • E. rapid transit division
    A rapid transit division is an organizational unit within a transportation agency responsible for planning, operating, and maintaining high-frequency, high-capacity urban rail or bus rapid transit services.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd43cf363c819087fd5ab441b4a3f4 completed March 20, 2026, 12:55 p.m.
Created at: March 20, 2026, 1:12 p.m.