Triple
T4580842
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | University of Wales |
E101848
|
entity |
| Predicate | completedMerger |
P15102
|
FINISHED |
| Object | 2011 |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 2011 | Statement: [University of Wales, completedMerger, 2011]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: completedMerger Context triple: [University of Wales, completedMerger, 2011]
-
A.
mergerResult
chosen
Indicates that one or more entities have combined into a single entity, specifying the outcome or resulting entity of the merger.
-
B.
missionAfterMerge
Indicates that one mission occurs or is valid only after another mission has been merged or combined into it.
-
C.
mergedBy
Indicates that one entity is combined or integrated into another entity through the action or decision of a specific agent.
-
D.
completedIn
Indicates that an action, process, or task was fully finished within a specified time period or duration.
-
E.
completedBefore
Indicates that one event or action was fully completed prior to the start or completion of another specified event or action.
- F. None of above.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69bd43d4ce208190b53158c882b222e3 |
completed | March 20, 2026, 12:55 p.m. |
| NER | Named-entity recognition | batch_69bd58e534708190a1ba9c5a29b3774d |
completed | March 20, 2026, 2:25 p.m. |
| PD | Predicate disambiguation | batch_69bd5228b70c8190ac48705e35a710c1 |
completed | March 20, 2026, 1:56 p.m. |
Created at: March 20, 2026, 1:10 p.m.