Triple

T4573998
Position Surface form Disambiguated ID Type / Status
Subject Kenya national cricket team E123099 entity
Predicate t20iStatus P26332 FINISHED
Object Twenty20 International team LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Twenty20 International team | Statement: [Kenya national cricket team, t20iStatus, Twenty20 International team]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: t20iStatus
Context triple: [Kenya national cricket team, t20iStatus, Twenty20 International team]
  • A. t20IStatus chosen
    Indicates the status or classification of an entity specifically in the context of Twenty20 International (T20I) cricket.
  • B. testStatus
    Indicates the current outcome or state of a test, such as whether it has passed, failed, or is still in progress.
  • C. testedDevice
    Indicates that one entity has performed a test on, or experimentally evaluated, another entity as a device.
  • D. maintenanceStatus
    Indicates the current state or condition of an entity with respect to its maintenance activities, such as whether it is pending, in progress, completed, or overdue.
  • E. platformStatus
    Indicates the current operational or availability state of a platform within a system or service context.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd46466c7081909d07f36be2d08804 completed March 20, 2026, 1:06 p.m.
NER Named-entity recognition batch_69bd6632708c8190b627d99363ab062c completed March 20, 2026, 3:22 p.m.
PD Predicate disambiguation batch_69bd620fc5e081908325ac8e6a6384ab completed March 20, 2026, 3:04 p.m.
Created at: March 20, 2026, 1:10 p.m.