Triple

T4572383
Position Surface form Disambiguated ID Type / Status
Subject Museum of Fine Arts station E123061 entity
Predicate instanceOf P0 FINISHED
Object surface station C17219 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: surface station
Context triple: [Museum of Fine Arts station, instanceOf, surface station]
  • A. spaceport facility
    A spaceport facility is a complex of specialized infrastructure and services designed to support the launch, landing, maintenance, and logistical operations of spacecraft and their crews.
  • B. mountain station
    A mountain station is a facility or settlement located at a high elevation in mountainous terrain, typically serving as a base for transportation, research, tourism, or outdoor activities.
  • C. space launch facility
    A space launch facility is a specialized complex equipped with infrastructure, systems, and support services for preparing, launching, and sometimes recovering spacecraft and launch vehicles.
  • D. field station
    A field station is a dedicated facility located in a natural or semi-natural environment that supports long-term scientific research, monitoring, and education.
  • E. steam pumping station
    A steam pumping station is an industrial facility that uses steam-powered engines to drive pumps for moving water or other fluids, typically for municipal water supply, drainage, or industrial processes.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd46466c7081909d07f36be2d08804 completed March 20, 2026, 1:06 p.m.
Created at: March 20, 2026, 1:10 p.m.