Triple

T4572118
Position Surface form Disambiguated ID Type / Status
Subject Old Town College Park E123054 entity
Predicate near P350 FINISHED
Object U.S. Route 1 E543 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: U.S. Route 1 | Statement: [Old Town College Park, near, U.S. Route 1]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: U.S. Route 1
Context triple: [Old Town College Park, near, U.S. Route 1]
  • A. U.S. Route 1 chosen
    U.S. Route 1 is a major north–south United States highway running along the East Coast from Key West, Florida, to Fort Kent, Maine.
  • B. U.S. Route 401
    U.S. Route 401 is a U.S. highway running through North Carolina and South Carolina, connecting communities such as Fayetteville and Raleigh as part of the regional transportation network.
  • C. U.S. Route 1A
    U.S. Route 1A is an alternate alignment of U.S. Route 1 in Maine that serves local traffic and provides access to communities bypassed by the main highway.
  • D. U.S. Route 2
    U.S. Route 2 is a major east–west United States highway that runs across the northern part of the country, stretching from the Great Lakes region to northern New England.
  • E. U.S. Route 7
    U.S. Route 7 is a major north–south highway in New England that runs from Connecticut through Massachusetts to Vermont, connecting numerous towns and rural areas along its route.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd46466c7081909d07f36be2d08804 completed March 20, 2026, 1:06 p.m.
NER Named-entity recognition batch_69bd58c711408190a2b096daf57e6eac completed March 20, 2026, 2:25 p.m.
NED1 Entity disambiguation (via context triple) batch_69bdd3d709308190aeb6a71a9dabdd3c completed March 20, 2026, 11:10 p.m.
Created at: March 20, 2026, 1:10 p.m.