Triple
T4547645
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | De remediis utriusque fortunae |
E110084
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | didactic work |
C13091
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: didactic work Context triple: [De remediis utriusque fortunae, instanceOf, didactic work]
-
A.
work on education
Work on education encompasses the theories, practices, and activities aimed at improving teaching, learning, and educational systems to foster knowledge, skills, and personal development.
-
B.
didactic emblem book
chosen
A didactic emblem book is a type of illustrated early modern text that combines symbolic images, mottos, and explanatory verses or prose to convey moral, religious, or educational lessons.
-
C.
academic work
Academic work is any systematic intellectual effort—such as research, writing, studying, or teaching—conducted within an educational or scholarly context to generate, analyze, or communicate knowledge.
-
D.
pedagogical method
A pedagogical method is a structured approach or strategy used by educators to facilitate learning, guide instruction, and support students in achieving specific educational goals.
-
E.
teaching workshop
A teaching workshop is a structured, interactive session where educators develop and practice instructional skills, strategies, and tools to improve their teaching effectiveness.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69bd4412524c8190be5bcc9ddee91848 |
completed | March 20, 2026, 12:56 p.m. |
Created at: March 20, 2026, 1:05 p.m.