Triple
T4546433
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | British colonial authorities in Quebec |
E110058
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | British imperial administration |
C4090
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: British imperial administration Context triple: [British colonial authorities in Quebec, instanceOf, British imperial administration]
-
A.
British military administration
British military administration is the system of governance and organizational structures through which the British armed forces planned, directed, and controlled military operations and occupied territories.
-
B.
British colonial position
A British colonial position is an official role or office established by the British Empire to administer, govern, or oversee territories and populations under colonial rule.
-
C.
presidency of British India
The presidency of British India was a major administrative division governed by the British East India Company and later the British Crown, serving as a regional center of political, military, and economic control.
-
D.
British colonial administrator
A British colonial administrator is an official appointed by the British government to govern, manage, and implement imperial policies in overseas colonies, overseeing local administration, law, and economic exploitation.
-
E.
colonial government
chosen
A colonial government is the political and administrative system imposed by a foreign power to control and manage a colony’s territory, resources, and population, typically subordinating local authority to the interests of the colonizing state.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69bd4412524c8190be5bcc9ddee91848 |
completed | March 20, 2026, 12:56 p.m. |
Created at: March 20, 2026, 1:05 p.m.