Triple

T4529052
Position Surface form Disambiguated ID Type / Status
Subject Flybe E106248 entity
Predicate acquisitionOfBAConnectCompleted P23562 FINISHED
Object 2007 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 2007 | Statement: [Flybe, acquisitionOfBAConnectCompleted, 2007]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: acquisitionOfBAConnectCompleted
Context triple: [Flybe, acquisitionOfBAConnectCompleted, 2007]
  • A. acquisitionResultedIn
    Indicates that an acquisition event led to a particular outcome, state, or consequence for the involved entities.
  • B. acquisitionStatus chosen
    Indicates the current state or outcome of an acquisition process between entities (e.g., pending, completed, failed, or canceled).
  • C. completedWithDiscoveryOf
    Indicates that an action, process, or event was brought to completion as a direct result of a particular discovery.
  • D. connectsState
    Indicates a relationship where one entity serves as a link or conduit between different states, conditions, or statuses of another entity.
  • E. AOCEstablished
    Indicates that an organization or entity was formally founded or brought into existence at a specific time or under specific conditions.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd43f3d6e08190a91824f833d51bbe completed March 20, 2026, 12:56 p.m.
NER Named-entity recognition batch_69bd5779593081908593537b9239e01b completed March 20, 2026, 2:19 p.m.
PD Predicate disambiguation batch_69bd521cf77c819083852de3094d1377 completed March 20, 2026, 1:56 p.m.
Created at: March 20, 2026, 1:03 p.m.