Triple

T4524802
Position Surface form Disambiguated ID Type / Status
Subject Kyoto Protocol E103350 entity
Predicate secondCommitmentPeriod P4045 FINISHED
Object 2013-2020 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 2013-2020 | Statement: [Kyoto Protocol, secondCommitmentPeriod, 2013-2020]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: secondCommitmentPeriod
Context triple: [Kyoto Protocol, secondCommitmentPeriod, 2013-2020]
  • A. hasSecondTerm
    Indicates that an entity is associated with a second term in a sequence, pair, or ordered relationship.
  • B. secondPhase
    Indicates that an entity is in, or has progressed to, the second phase or stage of a multi-phase process or sequence.
  • C. secondPlanStartYear chosen
    Indicates the calendar year in which a second or subsequent plan begins.
  • D. secondSessionStartYear
    Indicates the calendar year in which an entity’s second session begins.
  • E. secondTermStartYear
    Indicates the calendar year in which an entity’s second term in a role, office, or position begins.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd43dba59881908cf59b31df8c7ae1 completed March 20, 2026, 12:55 p.m.
NER Named-entity recognition batch_69bd5773341c8190bf27745feb863575 completed March 20, 2026, 2:19 p.m.
PD Predicate disambiguation batch_69bd521cf77c819083852de3094d1377 completed March 20, 2026, 1:56 p.m.
Created at: March 20, 2026, 1:03 p.m.