Triple

T4511080
Position Surface form Disambiguated ID Type / Status
Subject Bull Run Watershed E102055 entity
Predicate instanceOf P0 FINISHED
Object drinking water source C6631 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: drinking water source
Context triple: [Bull Run Watershed, instanceOf, drinking water source]
  • A. water source chosen
    A water source is any natural or artificial origin from which water is obtained for ecological, domestic, agricultural, or industrial use.
  • B. drinking water infrastructure
    Drinking water infrastructure comprises the interconnected systems, facilities, and technologies used to source, treat, store, and distribute safe potable water to consumers.
  • C. drinking water standard
    A drinking water standard is a regulatory benchmark that defines the maximum allowable concentrations of specific contaminants in water intended for human consumption to protect public health and ensure safety.
  • D. drinking water quality report
    A drinking water quality report is a document that summarizes the sources, treatment processes, and measured levels of various contaminants in a public water supply to inform consumers about its safety and compliance with regulatory standards.
  • E. water supply system
    A water supply system is an interconnected network of sources, treatment facilities, storage structures, and distribution pipelines designed to deliver safe and reliable water to end users.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd43d6251c81909deecce3e6e9d69c completed March 20, 2026, 12:55 p.m.
Created at: March 20, 2026, 1:01 p.m.