Triple

T4491451
Position Surface form Disambiguated ID Type / Status
Subject Liddell Power Station E100581 entity
Predicate finalUnitClosed P56128 FINISHED
Object April 2023 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: April 2023 | Statement: [Liddell Power Station, finalUnitClosed, April 2023]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: finalUnitClosed
Context triple: [Liddell Power Station, finalUnitClosed, April 2023]
  • A. closedAsTerminal
    Indicates that a process, case, or interaction has been concluded in a final, non-reopenable (terminal) state.
  • B. closureCompleted chosen
    Indicates that a previously initiated closure process or shutdown has been fully and successfully completed.
  • C. closedBy
    Indicates that one entity performs the action of closing, finishing, or terminating another entity (such as a task, issue, or process).
  • D. closedDuring
    Indicates that an entity is not open or available for use during a specified time period or under certain conditions.
  • E. closedFor
    Indicates that an entity is not available or accessible for use, entry, or operation during a specified time, condition, or reason.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd43cdf15081909a4fa2585ff63b3e completed March 20, 2026, 12:55 p.m.
NER Named-entity recognition batch_69bd556e69f88190b9c16afc2afcdbef completed March 20, 2026, 2:10 p.m.
PD Predicate disambiguation batch_69bd5213e3d0819094b026989e686f01 completed March 20, 2026, 1:56 p.m.
Created at: March 20, 2026, 12:59 p.m.