Triple

T4470242
Position Surface form Disambiguated ID Type / Status
Subject A2C E98476 entity
Predicate isSynchronous P56713 FINISHED
Object true LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: true | Statement: [A2C, isSynchronous, true]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: isSynchronous
Context triple: [A2C, isSynchronous, true]
  • A. isAsynchronous
    Indicates that the related process, operation, or interaction occurs without requiring simultaneous timing or immediate coordination between the involved entities.
  • B. isSelfSynchronizing
    Indicates that a process, system, or component can automatically align its timing or state with others without requiring external coordination or control.
  • C. synchronizesWith
    Indicates that two or more entities coordinate their states or activities so that they occur in step or remain temporally consistent with each other.
  • D. isLongRunning
    Indicates that an action, process, or operation continues for an extended duration, typically longer than is usual or expected.
  • E. isDeterministic
    Indicates that the outcome of a process or function is fully determined by its inputs, with no randomness or variation between executions.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69b3454b4ae481908967426dd37284d6 completed March 12, 2026, 10:59 p.m.
NER Named-entity recognition batch_69b356fb69a0819099f0005779f4fcac completed March 13, 2026, 12:14 a.m.
PD Predicate disambiguation batch_69b3563bf4f8819081726cde3a34460b completed March 13, 2026, 12:11 a.m.
PDg Predicate description generation batch_69b356f9afc48190acb50c45a310e072 completed March 13, 2026, 12:14 a.m.
Created at: March 12, 2026, 11:34 p.m.