Triple
T4466783
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Itaipu Dam |
E98397
|
entity |
| Predicate | recordAnnualGeneration_TWh |
P41620
|
FINISHED |
| Object | 103.1 |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 103.1 | Statement: [Itaipu Dam, recordAnnualGeneration_TWh, 103.1]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: recordAnnualGeneration_TWh Context triple: [Itaipu Dam, recordAnnualGeneration_TWh, 103.1]
-
A.
grossElectricalCapacity_MWe
Indicates the total electrical power output capacity of a generating unit, measured in megawatts electric (MWe), before accounting for internal power consumption or losses.
-
B.
totalElectricalCapacity_MWe
Indicates the total electrical power generation capacity, measured in megawatts electric (MWe), that an entity can produce or supply.
-
C.
averageHouseholdsPoweredPerYear
Indicates the typical number of households that can be supplied with power over the course of one year.
-
D.
netElectricalCapacity_MWe
Indicates the relationship specifying an entity’s net electrical power generation capacity, measured in megawatts electric (MWe), after accounting for internal power consumption.
-
E.
powerplantOutput
chosen
Indicates the amount of energy or power produced by a power plant over a given period or at a specific moment.
- F. None of above.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69b3454b4ae481908967426dd37284d6 |
completed | March 12, 2026, 10:59 p.m. |
| NER | Named-entity recognition | batch_69b356fb69a0819099f0005779f4fcac |
completed | March 13, 2026, 12:14 a.m. |
| PD | Predicate disambiguation | batch_69b3563bf4f8819081726cde3a34460b |
completed | March 13, 2026, 12:11 a.m. |
Created at: March 12, 2026, 11:34 p.m.