Triple

T4466123
Position Surface form Disambiguated ID Type / Status
Subject Hunter Expressway E98381 entity
Predicate instanceOf P0 FINISHED
Object road infrastructure project C2938 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: road infrastructure project
Context triple: [Hunter Expressway, instanceOf, road infrastructure project]
  • A. road infrastructure
    Road infrastructure encompasses the physical structures, systems, and facilities—such as roads, bridges, tunnels, signage, and drainage—designed and built to support safe and efficient vehicular and pedestrian transportation.
  • B. infrastructure project chosen
    An infrastructure project is a large-scale, organized effort to plan, design, and construct foundational physical systems—such as transportation, utilities, and public facilities—that support a community’s or region’s economic and social activities.
  • C. road transportation corridor
    A road transportation corridor is a designated linear area of land that accommodates one or more roadways and associated infrastructure to enable the efficient movement of vehicles, goods, and people between key origins and destinations.
  • D. road network
    A road network is an interconnected system of roads, intersections, and related infrastructure that enables the movement of vehicles and pedestrians between different locations.
  • E. public transit and highway improvement program
    A public transit and highway improvement program is a coordinated set of projects and policies designed to enhance the capacity, safety, efficiency, and accessibility of transportation networks through upgrades to roads, highways, and mass transit systems.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69b3454a7c608190944f5455c8031d73 completed March 12, 2026, 10:59 p.m.
Created at: March 12, 2026, 11:34 p.m.