Triple

T4447319
Position Surface form Disambiguated ID Type / Status
Subject Schlieffen Plan E96321 entity
Predicate instanceOf P0 FINISHED
Object military plan C3532 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: military plan
Context triple: [Schlieffen Plan, instanceOf, military plan]
  • A. military planning document chosen
    A military planning document is a formal written plan that outlines objectives, strategies, resources, timelines, and contingencies for conducting military operations or activities.
  • B. military strategy
    Military strategy is the high-level planning and directing of armed forces and resources to achieve political and military objectives in war or conflict.
  • C. military mission
    A military mission is a coordinated operation undertaken by armed forces to achieve specific strategic, operational, or tactical objectives within defined constraints and rules of engagement.
  • D. military project
    A military project is a coordinated, goal-driven initiative undertaken by armed forces or defense organizations to develop, test, or deploy capabilities, technologies, or operations that enhance national security and military effectiveness.
  • E. military program
    A military program is an organized set of defense-related activities, projects, or initiatives designed to develop, maintain, or enhance a nation's armed forces capabilities and readiness.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69b345415ba481908df738e7174448ba completed March 12, 2026, 10:59 p.m.
Created at: March 12, 2026, 11:32 p.m.