Triple
T4433487
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Frankfurt Airport |
E95589
|
entity |
| Predicate | hasPlannedTerminal |
P10988
|
FINISHED |
| Object |
Terminal 3
Terminal 3 is a major new passenger terminal development at Frankfurt Airport designed to expand capacity and modernize the airport’s facilities.
|
E440600
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Terminal 3 | Statement: [Frankfurt Airport, hasPlannedTerminal, Terminal 3]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Terminal 3 Context triple: [Frankfurt Airport, hasPlannedTerminal, Terminal 3]
-
A.
Terminal 3
Terminal 3 is one of the main passenger terminals at Phoenix Sky Harbor International Airport, serving as a hub for multiple domestic and some international flights with modernized facilities and amenities.
-
B.
Terminal 3
Terminal 3 is the largest and most modern passenger terminal at Beijing Capital International Airport, serving as a major international aviation hub.
-
C.
Terminal 3
Terminal 3 is one of the main passenger terminals at Chicago O'Hare International Airport, serving numerous domestic and some international flights for major U.S. airlines.
-
D.
Terminal 3
Terminal 3 is one of the main passenger terminals at Fort Lauderdale–Hollywood International Airport, serving various domestic and international airline operations.
-
E.
Terminal 3
Terminal 3 is one of the passenger terminals at Mehrabad International Airport in Tehran, serving domestic air traffic within Iran.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Terminal 3 Triple: [Frankfurt Airport, hasPlannedTerminal, Terminal 3]
Generated description
Terminal 3 is a major new passenger terminal development at Frankfurt Airport designed to expand capacity and modernize the airport’s facilities.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Terminal 3 Target entity description: Terminal 3 is a major new passenger terminal development at Frankfurt Airport designed to expand capacity and modernize the airport’s facilities.
-
A.
Terminal 3
Terminal 3 is a major new passenger terminal under development at Taiwan Taoyuan International Airport, intended to expand capacity and modernize the airport’s facilities.
-
B.
Terminal 3
Terminal 3 is a major passenger terminal at Dubai International Airport, primarily serving Emirates and known as one of the largest airport terminals in the world.
-
C.
Terminal 3
Terminal 3 is the largest and most modern passenger terminal at Beijing Capital International Airport, serving as a major international aviation hub.
-
D.
Terminal 3
Terminal 3 is the newest and largest international passenger terminal at São Paulo–Guarulhos International Airport, designed to handle long-haul flights with modern facilities and increased capacity.
-
E.
Terminal 3
Terminal 3 is a major passenger terminal at Wuhan Tianhe International Airport, serving as a key hub for domestic and international air travel in central China.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69b3453ea2b48190a26f154b3b8fece5 |
completed | March 12, 2026, 10:59 p.m. |
| NER | Named-entity recognition | batch_69b35587bc048190aee8e0ed94b6e064 |
completed | March 13, 2026, 12:08 a.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69b6137171148190b77a6f783d5cf315 |
completed | March 15, 2026, 2:03 a.m. |
| NEDg | Description generation | batch_69b6177d1a588190991fddf506239d22 |
completed | March 15, 2026, 2:20 a.m. |
| NED2 | Entity disambiguation (via description) | batch_69b61b6bc1448190b30d444a821bb1a5 |
completed | March 15, 2026, 2:37 a.m. |
Created at: March 12, 2026, 11:31 p.m.