Triple
T4431959
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Mula River |
E95350
|
entity |
| Predicate | damOnRiver |
P32893
|
FINISHED |
| Object | Mula Dam |
E440519
|
NE FINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Mula Dam | Statement: [Mula River, damOnRiver, Mula Dam]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Mula Dam Context triple: [Mula River, damOnRiver, Mula Dam]
-
A.
Mula Dam
chosen
Mula Dam is a major irrigation and water-supply dam built on the Mula River in Maharashtra, India.
-
B.
Wayatinah Dam
Wayatinah Dam is a hydroelectric dam on Tasmania’s Derwent River that forms part of the state’s major power generation scheme.
-
C.
Manantali Dam
Manantali Dam is a large multi-purpose dam in Mali that plays a key role in hydroelectric power generation, irrigation, and flood control for the Senegal River basin.
-
D.
Wlingi Dam
Wlingi Dam is a hydroelectric and irrigation dam located on the Brantas River in East Java, Indonesia.
-
E.
Tantangara Dam
Tantangara Dam is a major concrete gravity dam in New South Wales, Australia, built as part of the Snowy Mountains Scheme to store water for hydroelectric power generation and irrigation.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: damOnRiver Context triple: [Mula River, damOnRiver, Mula Dam]
-
A.
watercourseHasDam
chosen
Indicates that a watercourse (such as a river or stream) has a dam constructed on or across it.
-
B.
isTributaryDamOf
Indicates that a dam is constructed on and regulates the flow of a tributary river or stream relative to a main watercourse.
-
C.
upstreamDam
Indicates that one entity is located or positioned upstream of another entity in relation to a dam, typically affecting or influenced by the dam’s presence or operation.
-
D.
majorPortOnRiver
Indicates that a port is a primary or significant harbor facility located on the banks of a specified river.
-
E.
hasRiver
Indicates that a location or area contains, is traversed by, or is directly associated with a river.
- F. None of above.
Provenance (4 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69b3453c2a0c8190926b574c90766db9 |
completed | March 12, 2026, 10:59 p.m. |
| NER | Named-entity recognition | batch_69b3556cd83881908547aa311c4f17fa |
completed | March 13, 2026, 12:08 a.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69b628002e208190a68c659abd348040 |
completed | March 15, 2026, 3:31 a.m. |
| PD | Predicate disambiguation | batch_69b34f6078cc8190831b89f404198cc5 |
completed | March 12, 2026, 11:42 p.m. |
Created at: March 12, 2026, 11:31 p.m.