Triple

T4410462
Position Surface form Disambiguated ID Type / Status
Subject Project Daedalus E94839 entity
Predicate realizationStatus P22521 FINISHED
Object never built LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: never built | Statement: [Project Daedalus, realizationStatus, never built]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: realizationStatus
Context triple: [Project Daedalus, realizationStatus, never built]
  • A. realityStatus
    Indicates the relationship between an entity and its state of existence or authenticity within a given context or world (e.g., real, fictional, hypothetical, simulated).
  • B. hasRealizationAs
    Indicates that something abstract, such as a plan, design, or concept, is concretely implemented or manifested as a particular realized form.
  • C. implementationStatus chosen
    Indicates the current state or progress of carrying out or realizing something, such as a plan, design, or requirement.
  • D. acquisitionStatus
    Indicates the current state or outcome of an acquisition process between entities (e.g., pending, completed, failed, or canceled).
  • E. commissionedStatus
    Indicates whether an entity has been formally authorized, activated, or placed into official service or duty.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69b34539638c8190abfea3eb29425210 completed March 12, 2026, 10:59 p.m.
NER Named-entity recognition batch_69b354e4c58c8190b4190aad3095a1dd completed March 13, 2026, 12:05 a.m.
PD Predicate disambiguation batch_69b34f5b36a881909bf2e970aa523390 completed March 12, 2026, 11:42 p.m.
Created at: March 12, 2026, 11:29 p.m.