Triple

T4409958
Position Surface form Disambiguated ID Type / Status
Subject Royal William Victualling Yard, Plymouth E94829 entity
Predicate instanceOf P0 FINISHED
Object naval victualling yard C15947 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: naval victualling yard
Context triple: [Royal William Victualling Yard, Plymouth, instanceOf, naval victualling yard]
  • A. naval arsenal
    A naval arsenal is a specialized military facility where warships are built, repaired, equipped, and supplied with weapons, ammunition, and other naval stores.
  • B. shipbuilding facility
    A shipbuilding facility is an industrial site equipped with specialized infrastructure, tools, and workforce for designing, constructing, and outfitting ships and other large marine vessels.
  • C. naval administrative office
    A naval administrative office is an organizational unit responsible for managing the paperwork, personnel records, logistics, and regulatory compliance that support the operations of a navy or naval installation.
  • D. naval office
    A naval office is an administrative entity within a navy responsible for managing operations, logistics, personnel, and documentation related to maritime military activities.
  • E. former naval base
    A former naval base is a decommissioned military maritime facility that once supported naval operations but has since been repurposed, abandoned, or converted to civilian use.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69b34539638c8190abfea3eb29425210 completed March 12, 2026, 10:59 p.m.
Created at: March 12, 2026, 11:29 p.m.