Triple

T4400995
Position Surface form Disambiguated ID Type / Status
Subject Stone Arch Bridge E93614 entity
Predicate railTrafficEnded P27833 FINISHED
Object 1978 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 1978 | Statement: [Stone Arch Bridge, railTrafficEnded, 1978]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: railTrafficEnded
Context triple: [Stone Arch Bridge, railTrafficEnded, 1978]
  • A. railServiceEnded chosen
    Indicates that a previously operating rail service has been discontinued or terminated.
  • B. railwayTraffic
    Indicates the presence, flow, or management of train movements along railway lines between locations.
  • C. railwayWorksClosed
    Indicates that a railway workshop, depot, or related railway works facility has ceased operations or been officially closed.
  • D. railStatus
    Indicates the current operational condition or state of a rail-related entity (such as a track, line, or service) within the system.
  • E. openedToRailTraffic
    Indicates that a rail line, track, or related infrastructure has begun operating and is officially available for use by train traffic.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69b345158c748190a2c040fce2da9980 completed March 12, 2026, 10:58 p.m.
NER Named-entity recognition batch_69b352cf218481908d072fec58361f28 completed March 12, 2026, 11:57 p.m.
PD Predicate disambiguation batch_69b34f597998819092477efdedb51427 completed March 12, 2026, 11:42 p.m.
Created at: March 12, 2026, 11:28 p.m.