Triple

T4378275
Position Surface form Disambiguated ID Type / Status
Subject Librarian’s Lobby E99061 entity
Predicate instanceOf P0 FINISHED
Object entrance hall C3375 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: entrance hall
Context triple: [Librarian’s Lobby, instanceOf, entrance hall]
  • A. reception room chosen
    A reception room is a designated area where visitors are greeted, wait, and may receive initial services or information before proceeding to other parts of a building or facility.
  • B. entrance
    An entrance is a designated point of access that allows people or objects to move from the outside into a defined space or area.
  • C. great hall
    A great hall is a large, central gathering space in a building, often used for ceremonies, feasts, or communal activities.
  • D. ceremonial reception room
    A ceremonial reception room is a formal, often ornately decorated space used for hosting official events, dignitaries, and important social or state functions.
  • E. ceremonial hall
    A ceremonial hall is a large, formal space designed to host significant events, rituals, and gatherings such as weddings, graduations, and official ceremonies.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69b3454ea8f48190a49c2436624d6ef6 completed March 12, 2026, 10:59 p.m.
Created at: March 12, 2026, 11:18 p.m.