Triple

T4364275
Position Surface form Disambiguated ID Type / Status
Subject Kentucky Lake E98734 entity
Predicate impoundedBy P10781 FINISHED
Object Kentucky Dam E98733 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Kentucky Dam | Statement: [Kentucky Lake, impoundedBy, Kentucky Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Kentucky Dam
Context triple: [Kentucky Lake, impoundedBy, Kentucky Dam]
  • A. Kentucky Dam chosen
    Kentucky Dam is a major hydroelectric and flood-control dam in western Kentucky that forms Kentucky Lake on the Tennessee River.
  • B. High Rock Dam
    High Rock Dam is a hydroelectric dam in North Carolina that impounds the Yadkin River to form High Rock Lake, a major reservoir for power generation and recreation.
  • C. Wilson Dam
    Wilson Dam is a large hydroelectric and navigation dam in northern Alabama that forms part of the Tennessee Valley Authority system on the Tennessee River.
  • D. W. Kerr Scott Dam
    W. Kerr Scott Dam is a U.S. Army Corps of Engineers flood-control and recreation dam in North Carolina that creates W. Kerr Scott Reservoir on the Yadkin River.
  • E. Goodwin Dam
    Goodwin Dam is a concrete gravity diversion dam on California’s Stanislaus River that helps regulate river flow and supplies irrigation water to surrounding agricultural areas.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69b3454c772081908e20173e379e8ebe completed March 12, 2026, 10:59 p.m.
NER Named-entity recognition batch_69b351e70a748190af6f1b709a0e75e6 completed March 12, 2026, 11:53 p.m.
NED1 Entity disambiguation (via context triple) batch_69be396a2ff481908974870ceb903188 completed March 21, 2026, 6:23 a.m.
Created at: March 12, 2026, 11:16 p.m.