Triple

T4301930
Position Surface form Disambiguated ID Type / Status
Subject Paisley Canal Line E99856 entity
Predicate electrificationProjectCompleted P21852 FINISHED
Object December 2012 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: December 2012 | Statement: [Paisley Canal Line, electrificationProjectCompleted, December 2012]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: electrificationProjectCompleted
Context triple: [Paisley Canal Line, electrificationProjectCompleted, December 2012]
  • A. electrificationCompleted chosen
    Indicates that the process of providing electrical power infrastructure to the relevant entity or area has been fully completed.
  • B. electrificationEnd
    Indicates the point in time or event at which an electrification process or electrified state comes to an end.
  • C. electrificationCoverage
    Indicates the extent to which a given area, system, or population is supplied with access to electrical power.
  • D. electrification
    Indicates the process or state of providing electrical power or converting something to operate using electricity.
  • E. electrificationSystem
    Indicates the type of electrical power system used to supply energy (typically to infrastructure or vehicles) for operation.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69b345528ebc8190b5abc7e95094792d completed March 12, 2026, 10:59 p.m.
NER Named-entity recognition batch_69b350b66450819089c9ff6ff9f045e5 completed March 12, 2026, 11:48 p.m.
PD Predicate disambiguation batch_69b347fe55a88190b77bab0c0f38e1aa completed March 12, 2026, 11:10 p.m.
Created at: March 12, 2026, 11:08 p.m.