Triple
T4275317
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | actix-web |
E97035
|
entity |
| Predicate | usesRuntime |
P924
|
FINISHED |
| Object | Actix runtime |
E97034
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Actix runtime | Statement: [actix-web, usesRuntime, Actix runtime]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Actix runtime Context triple: [actix-web, usesRuntime, Actix runtime]
-
A.
actix-web
actix-web is a powerful, asynchronous web framework for the Rust programming language, known for its high performance and strong type safety.
-
B.
Mono runtime
Mono runtime is an open-source implementation of Microsoft’s .NET framework that enables cross-platform execution of .NET applications on systems such as Linux, macOS, and mobile devices.
-
C.
tokio
chosen
Tokio is a popular asynchronous runtime and ecosystem for the Rust programming language, providing tools for writing fast, reliable, non-blocking applications.
-
D.
R Reactor
R Reactor was one of the plutonium and tritium production nuclear reactors that operated at the U.S. Department of Energy’s Savannah River Site during the Cold War.
-
E.
L Reactor
L Reactor was a heavy water–moderated nuclear production reactor at the Savannah River Site in South Carolina, historically used to produce materials such as plutonium and tritium for the U.S. nuclear weapons program.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69b34544be3c819084d1ab82d29f90c5 |
completed | March 12, 2026, 10:59 p.m. |
| NER | Named-entity recognition | batch_69b3501c35688190a7d15d904f15f968 |
completed | March 12, 2026, 11:45 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69b5b7b0b2ec819090ccf042917ae207 |
completed | March 14, 2026, 7:32 p.m. |
Created at: March 12, 2026, 11:07 p.m.