Triple

T4259655
Position Surface form Disambiguated ID Type / Status
Subject Épernay E96071 entity
Predicate servedByRailLine P1293 FINISHED
Object Paris–Strasbourg railway E194421 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Paris–Strasbourg railway | Statement: [Épernay, servedByRailLine, Paris–Strasbourg railway]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Paris–Strasbourg railway
Context triple: [Épernay, servedByRailLine, Paris–Strasbourg railway]
  • A. Paris–Strasbourg railway chosen
    The Paris–Strasbourg railway is a major French mainline route connecting the capital Paris with the eastern city of Strasbourg, serving as a key corridor for both passenger and freight traffic.
  • B. Paris–Marseille railway
    The Paris–Marseille railway is a major French mainline rail route linking the capital Paris with the Mediterranean port city of Marseille, serving as one of the country’s most important north–south transport corridors.
  • C. Paris–Lyon railway
    The Paris–Lyon railway is a major French mainline rail route connecting the capital Paris with the city of Lyon, serving as a key corridor for both passenger and freight traffic.
  • D. Strasbourg–Offenburg railway
    The Strasbourg–Offenburg railway is an international rail line connecting Strasbourg in France with Offenburg in Germany, serving as a key cross-border passenger and freight corridor across the Rhine.
  • E. Paris–Brest railway
    The Paris–Brest railway is a major French rail line connecting Paris with the western city of Brest, serving numerous intermediate towns and regional hubs along its route.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69b3454095ac81909c2494f7ff294af1 completed March 12, 2026, 10:59 p.m.
NER Named-entity recognition batch_69b34f7fe7348190baed8d214268b756 completed March 12, 2026, 11:42 p.m.
NED1 Entity disambiguation (via context triple) batch_69b5b78825508190b2b6ca46c8e1b27c completed March 14, 2026, 7:31 p.m.
Created at: March 12, 2026, 11:06 p.m.