Triple
T4253936
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Pensacola Beach |
E95925
|
entity |
| Predicate | connectedBy |
P37
|
FINISHED |
| Object | Bob Sikes Bridge |
E350685
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Bob Sikes Bridge | Statement: [Pensacola Beach, connectedBy, Bob Sikes Bridge]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Bob Sikes Bridge Context triple: [Pensacola Beach, connectedBy, Bob Sikes Bridge]
-
A.
Bob Sikes Bridge
chosen
Bob Sikes Bridge is a causeway in Florida that connects the city of Gulf Breeze to Pensacola Beach across the Santa Rosa Sound.
-
B.
Don N. Holt Bridge
The Don N. Holt Bridge is a major steel cantilever bridge in South Carolina that carries Interstate 526 over the Cooper River near Charleston.
-
C.
Harry W. Nice Memorial Bridge
The Harry W. Nice Memorial Bridge is a major highway bridge carrying U.S. Route 301 across the Potomac River between Maryland and Virginia.
-
D.
Rockwell Bridge
Rockwell Bridge is a roadway bridge in Metro Manila, Philippines, that connects the Rockwell Center area to neighboring districts across the Pasig River.
-
E.
Glenn L. Jackson Memorial Bridge
The Glenn L. Jackson Memorial Bridge is a major concrete segmental bridge carrying traffic across the Columbia River between Oregon and Washington as part of the Portland metropolitan highway system.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69b3453f759881909b91f01a1e82c036 |
completed | March 12, 2026, 10:59 p.m. |
| NER | Named-entity recognition | batch_69b34ebe6fbc8190a89269b478b3f435 |
completed | March 12, 2026, 11:39 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69c71a548f8081909e347a1c7cd4e9fc |
completed | March 28, 2026, 12:01 a.m. |
Created at: March 12, 2026, 11:06 p.m.