Triple

T4238443
Position Surface form Disambiguated ID Type / Status
Subject Aqua Paola aqueduct E94750 entity
Predicate instanceOf P0 FINISHED
Object early modern infrastructure project C2938 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: early modern infrastructure project
Context triple: [Aqua Paola aqueduct, instanceOf, early modern infrastructure project]
  • A. infrastructure project chosen
    An infrastructure project is a large-scale, organized effort to plan, design, and construct foundational physical systems—such as transportation, utilities, and public facilities—that support a community’s or region’s economic and social activities.
  • B. early modern state
    An early modern state is a centralized political entity that emerged in Europe between the 15th and 18th centuries, characterized by growing bureaucratic administration, territorial sovereignty, standing armies, and increasingly standardized systems of law and taxation.
  • C. historic infrastructure
    Historic infrastructure comprises long-standing physical structures and systems—such as bridges, roads, canals, and railways—that were built in the past and continue to embody cultural, technological, and architectural significance.
  • D. early modern political institution
    An early modern political institution is an organized structure of authority and governance, such as monarchies, parliaments, courts, or bureaucracies, that emerged or operated roughly between the 15th and 18th centuries to regulate power, law, and social order.
  • E. early modern corporation
    An early modern corporation was a legally chartered collective entity, often granted monopolistic privileges by the state, that pooled capital and shared risk among investors to undertake large-scale commercial, colonial, or infrastructural ventures.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69b34537cc6481909cd0a96acbb33ef7 completed March 12, 2026, 10:59 p.m.
Created at: March 12, 2026, 11:05 p.m.