Triple

T423724
Position Surface form Disambiguated ID Type / Status
Subject I. I. Rabi E8159 entity
Predicate memberOf P10 FINISHED
Object General Advisory Committee of the U.S. Atomic Energy Commission
The General Advisory Committee of the U.S. Atomic Energy Commission was a high-level scientific advisory body that counseled the U.S. government on nuclear energy policy, research, and weapons development in the mid-20th century.
E54179 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: General Advisory Committee of the U.S. Atomic Energy Commission | Statement: [I. I. Rabi, memberOf, General Advisory Committee of the U.S. Atomic Energy Commission]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: General Advisory Committee of the U.S. Atomic Energy Commission
Context triple: [I. I. Rabi, memberOf, General Advisory Committee of the U.S. Atomic Energy Commission]
  • A. S-1 Uranium Committee
    The S-1 Uranium Committee was a U.S. government scientific advisory group that coordinated early research into nuclear fission and atomic weapons, laying the groundwork for what became the Manhattan Project.
  • B. United States Atomic Energy Commission
    The United States Atomic Energy Commission was the federal agency that oversaw and regulated the development, production, and civilian use of nuclear energy and weapons in the United States during the early Cold War era.
  • C. President's Science Advisory Committee
    The President's Science Advisory Committee was a group of leading scientists that advised the U.S. President on scientific and technological issues, particularly during the Cold War era.
  • D. Nuclear Planning Group
    The Nuclear Planning Group is NATO’s senior body responsible for developing and coordinating the Alliance’s nuclear policy and planning among member states.
  • E. National Security Resources Board
    The National Security Resources Board was a U.S. government body responsible for planning and coordinating the mobilization of the nation’s industrial and civilian resources for national defense during the early Cold War era.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: General Advisory Committee of the U.S. Atomic Energy Commission
Triple: [I. I. Rabi, memberOf, General Advisory Committee of the U.S. Atomic Energy Commission]
Generated description
The General Advisory Committee of the U.S. Atomic Energy Commission was a high-level scientific advisory body that counseled the U.S. government on nuclear energy policy, research, and weapons development in the mid-20th century.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: General Advisory Committee of the U.S. Atomic Energy Commission
Target entity description: The General Advisory Committee of the U.S. Atomic Energy Commission was a high-level scientific advisory body that counseled the U.S. government on nuclear energy policy, research, and weapons development in the mid-20th century.
  • A. S-1 Uranium Committee
    The S-1 Uranium Committee was a U.S. government scientific advisory group that coordinated early research into nuclear fission and atomic weapons, laying the groundwork for what became the Manhattan Project.
  • B. United States Atomic Energy Commission
    The United States Atomic Energy Commission was the federal agency that oversaw and regulated the development, production, and civilian use of nuclear energy and weapons in the United States during the early Cold War era.
  • C. President's Science Advisory Committee
    The President's Science Advisory Committee was a group of leading scientists that advised the U.S. President on scientific and technological issues, particularly during the Cold War era.
  • D. Nuclear Planning Group
    The Nuclear Planning Group is NATO’s senior body responsible for developing and coordinating the Alliance’s nuclear policy and planning among member states.
  • E. National Security Resources Board
    The National Security Resources Board was a U.S. government body responsible for planning and coordinating the mobilization of the nation’s industrial and civilian resources for national defense during the early Cold War era.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a2e7f1d1bc81909cf2dc9754a3c334 completed Feb. 28, 2026, 1:04 p.m.
NER Named-entity recognition batch_69a2eed3e4cc8190ba6aff3bd1adb06f completed Feb. 28, 2026, 1:34 p.m.
NED1 Entity disambiguation (via context triple) batch_69a42f64cccc8190afae9aa50097670a completed March 1, 2026, 12:21 p.m.
NEDg Description generation batch_69a42fe4b0448190a8077873001b5a21 completed March 1, 2026, 12:24 p.m.
NED2 Entity disambiguation (via description) batch_69a43057a4688190829bfbe668d3889b completed March 1, 2026, 12:25 p.m.
Created at: Feb. 28, 2026, 1:11 p.m.