Triple
T4216676
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Red Rock Dam |
E94234
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | flood control structure |
C13691
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: flood control structure Context triple: [Red Rock Dam, instanceOf, flood control structure]
-
A.
lock and dam structure
A lock and dam structure is an engineered system on a waterway that combines a gated dam to control water levels with a lock chamber to raise and lower vessels between different elevations for safe and efficient navigation.
-
B.
embankment dam
An embankment dam is a large artificial barrier constructed from compacted earth or rock materials to hold back water and create a reservoir.
-
C.
flood control agency
A flood control agency is an organization responsible for planning, implementing, and managing measures to prevent, mitigate, and respond to flooding in a specific region.
-
D.
reservoir dam
chosen
A reservoir dam is a large engineered barrier built across a watercourse to store and regulate water in an upstream reservoir for purposes such as water supply, flood control, irrigation, and power generation.
-
E.
movable flood barrier
A movable flood barrier is a deployable structure designed to be raised or repositioned as needed to temporarily block or redirect water and protect areas from flooding.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69b3451997e08190851db4a9a588837d |
completed | March 12, 2026, 10:58 p.m. |
Created at: March 12, 2026, 11:04 p.m.