Triple

T4214428
Position Surface form Disambiguated ID Type / Status
Subject San Francisco Department of Public Works E93979 entity
Predicate hasDivision P35 FINISHED
Object Infrastructure Design and Construction division
The Infrastructure Design and Construction division is a unit of San Francisco’s public works department responsible for planning, engineering, and delivering the city’s public infrastructure projects.
E425123 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Infrastructure Design and Construction division | Statement: [San Francisco Department of Public Works, hasDivision, Infrastructure Design and Construction division]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Infrastructure Design and Construction division
Context triple: [San Francisco Department of Public Works, hasDivision, Infrastructure Design and Construction division]
  • A. Building Design and Construction division
    The Building Design and Construction division is a unit within the San Francisco Department of Public Works responsible for planning, designing, and overseeing the construction and renovation of public buildings and facilities in the city.
  • B. Engineering and Construction division
    The Engineering and Construction division is a unit of the Maryland Port Administration responsible for planning, designing, and overseeing port infrastructure projects and facility improvements.
  • C. Construction and Building Services Division
    The Construction and Building Services Division is a specialist branch of the Institution of Mechanical Engineers focused on advancing mechanical engineering practice, standards, and innovation in the construction and building services sectors.
  • D. Directorate of Construction
    The Directorate of Construction is the division of the U.S. Occupational Safety and Health Administration responsible for developing and enforcing safety and health standards in the construction industry.
  • E. Engineering & Construction Group
    Engineering & Construction Group is the global engineering and construction division of Samsung C&T, responsible for large-scale infrastructure, building, and industrial projects.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Infrastructure Design and Construction division
Triple: [San Francisco Department of Public Works, hasDivision, Infrastructure Design and Construction division]
Generated description
The Infrastructure Design and Construction division is a unit of San Francisco’s public works department responsible for planning, engineering, and delivering the city’s public infrastructure projects.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Infrastructure Design and Construction division
Target entity description: The Infrastructure Design and Construction division is a unit of San Francisco’s public works department responsible for planning, engineering, and delivering the city’s public infrastructure projects.
  • A. Building Design and Construction division
    The Building Design and Construction division is a unit within the San Francisco Department of Public Works responsible for planning, designing, and overseeing the construction and renovation of public buildings and facilities in the city.
  • B. Engineering and Construction division
    The Engineering and Construction division is a unit of the Maryland Port Administration responsible for planning, designing, and overseeing port infrastructure projects and facility improvements.
  • C. Construction and Building Services Division
    The Construction and Building Services Division is a specialist branch of the Institution of Mechanical Engineers focused on advancing mechanical engineering practice, standards, and innovation in the construction and building services sectors.
  • D. Directorate of Construction
    The Directorate of Construction is the division of the U.S. Occupational Safety and Health Administration responsible for developing and enforcing safety and health standards in the construction industry.
  • E. Engineering & Construction Group
    Engineering & Construction Group is the global engineering and construction division of Samsung C&T, responsible for large-scale infrastructure, building, and industrial projects.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69b3451743608190808f41d17ccf2650 completed March 12, 2026, 10:58 p.m.
NER Named-entity recognition batch_69b34be8ba408190baee362e5abbe75b completed March 12, 2026, 11:27 p.m.
NED1 Entity disambiguation (via context triple) batch_69b5a852e0448190bc488087e92a94d4 completed March 14, 2026, 6:26 p.m.
NEDg Description generation batch_69b5a8e024a081909e7ecbe969793281 completed March 14, 2026, 6:28 p.m.
NED2 Entity disambiguation (via description) batch_69b5acefd1f881908226ff68a741552b completed March 14, 2026, 6:46 p.m.
Created at: March 12, 2026, 11:04 p.m.