Triple
T4208714
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Rail Settlement Plan |
E93845
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | rail industry settlement system |
C10448
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: rail industry settlement system Context triple: [Rail Settlement Plan, instanceOf, rail industry settlement system]
-
A.
industry clearing and settlement system
chosen
An industry clearing and settlement system is a centralized infrastructure that validates, nets, and finalizes financial transactions between market participants, ensuring accurate, timely, and risk-managed transfer of funds and securities.
-
B.
railway industry body
A railway industry body is an organization that represents, coordinates, and sets standards or policies for companies and stakeholders involved in the rail transport sector.
-
C.
public railway
A public railway is a government- or publicly-owned rail transport system that provides scheduled passenger and/or freight services accessible to the general population, typically operating on standardized tracks and infrastructure.
-
D.
railway network
A railway network is an interconnected system of tracks, stations, signaling, and rolling stock that enables the organized movement of trains between multiple locations.
-
E.
railway signaling system
A railway signaling system is an integrated set of trackside and onboard equipment, rules, and communication protocols that control train movements to ensure safe separation, efficient routing, and protection against collisions.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69b3451743608190808f41d17ccf2650 |
completed | March 12, 2026, 10:58 p.m. |
Created at: March 12, 2026, 11:03 p.m.