Triple

T4198223
Position Surface form Disambiguated ID Type / Status
Subject Fast of Gedaliah E86003 entity
Predicate alternativeDateCondition P2315 FINISHED
Object postponed to 4 Tishrei when 3 Tishrei falls on Shabbat LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: postponed to 4 Tishrei when 3 Tishrei falls on Shabbat | Statement: [Fast of Gedaliah, alternativeDateCondition, postponed to 4 Tishrei when 3 Tishrei falls on Shabbat]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: alternativeDateCondition
Context triple: [Fast of Gedaliah, alternativeDateCondition, postponed to 4 Tishrei when 3 Tishrei falls on Shabbat]
  • A. hasDateWith
    Indicates that one entity is scheduled to go on or is engaged in a romantic or social date with another entity.
  • B. dateDetermination chosen
    Indicates the process or criteria by which a specific date is identified, calculated, or assigned in relation to an event or condition.
  • C. dateOf
    Indicates that one entity specifies the calendar date associated with another entity, such as when it occurred, was created, or is scheduled.
  • D. dateChangesWith
    Indicates that the date associated with one entity is altered or updated in conjunction with, or as a result of, a change involving another entity.
  • E. successorHolidayDate
    Indicates that one holiday’s date directly follows or succeeds another holiday’s date in a temporal sequence.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69aed93b89f48190a31f6d57c760e42f completed March 9, 2026, 2:29 p.m.
NER Named-entity recognition batch_69af0360bc8081908ceb2483eef89174 completed March 9, 2026, 5:29 p.m.
PD Predicate disambiguation batch_69af01959c4881909eb1adcb3bdadbe6 completed March 9, 2026, 5:21 p.m.
Created at: March 9, 2026, 3:48 p.m.