Triple

T4183497
Position Surface form Disambiguated ID Type / Status
Subject Puna Tsang Chhu E88251 entity
Predicate hasHydropowerProject P15311 FINISHED
Object Punatsangchhu-II Hydroelectric Project E419518 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Punatsangchhu-II Hydroelectric Project | Statement: [Puna Tsang Chhu, hasHydropowerProject, Punatsangchhu-II Hydroelectric Project]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Punatsangchhu-II Hydroelectric Project
Context triple: [Puna Tsang Chhu, hasHydropowerProject, Punatsangchhu-II Hydroelectric Project]
  • A. Punatsangchhu-I Hydroelectric Project chosen
    Punatsangchhu-I Hydroelectric Project is a major run-of-the-river hydropower plant under construction in Bhutan, developed with Indian assistance to generate electricity for domestic use and export.
  • B. Karot Hydropower Project
    The Karot Hydropower Project is a major run-of-river hydroelectric power plant on the Jhelum River in Pakistan, developed under the China–Pakistan Economic Corridor to boost the country’s electricity generation capacity.
  • C. Shimsha Hydroelectric Project
    Shimsha Hydroelectric Project is one of Karnataka’s early hydroelectric power stations, built on the Shimsha River to generate electricity using its water flow.
  • D. Karuma Hydropower Station
    Karuma Hydropower Station is a major hydroelectric power plant in Uganda that harnesses the flow of the Victoria Nile to generate electricity for the national grid.
  • E. Teesta V Hydroelectric Project
    Teesta V Hydroelectric Project is a major hydroelectric power station in Sikkim, India, harnessing the Teesta River to generate electricity for the region.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69aed9477e8c81908bcb862d2db55b1d completed March 9, 2026, 2:29 p.m.
NER Named-entity recognition batch_69af0307a0b481909c7287402a8c78c4 completed March 9, 2026, 5:27 p.m.
NED1 Entity disambiguation (via context triple) batch_69b5961845488190827b03e161f1235e completed March 14, 2026, 5:08 p.m.
Created at: March 9, 2026, 3:45 p.m.