Triple

T4178964
Position Surface form Disambiguated ID Type / Status
Subject MBTA diesel locomotives E86545 entity
Predicate usedOnLine P15252 FINISHED
Object Kingston Line E167927 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Kingston Line | Statement: [MBTA diesel locomotives, usedOnLine, Kingston Line]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Kingston Line
Context triple: [MBTA diesel locomotives, usedOnLine, Kingston Line]
  • A. Kingston Line chosen
    The Kingston Line is a Massachusetts Bay Transportation Authority (MBTA) Commuter Rail route serving communities south of Boston between the city and Kingston.
  • B. Kingston Loop Line
    The Kingston Loop Line is a suburban railway route in southwest London that forms a loop connecting several towns and districts between London Waterloo and the South West Main Line.
  • C. Harbour Line
    Harbour Line is a major corridor of Mumbai's suburban railway network that connects the city’s eastern waterfront and Navi Mumbai suburbs to key central and southern Mumbai terminals.
  • D. Harbour Line
    Harbour Line is a Copenhagen Metro route that serves areas along the city’s waterfront and harbor districts.
  • E. Myrtle Avenue Line
    The Myrtle Avenue Line is a New York City Subway line in Brooklyn and Queens, primarily served by the M train.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69aed93de98c8190ad838ce507b77c8a completed March 9, 2026, 2:29 p.m.
NER Named-entity recognition batch_69af030114c88190b725908a32ace750 completed March 9, 2026, 5:27 p.m.
NED1 Entity disambiguation (via context triple) batch_69b589f5864881909c9fc787dd9b2341 completed March 14, 2026, 4:16 p.m.
Created at: March 9, 2026, 3:45 p.m.