Triple

T4158937
Position Surface form Disambiguated ID Type / Status
Subject Fifth Crusade (planning phase) E91482 entity
Predicate instanceOf P0 FINISHED
Object crusade planning phase C180 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: crusade planning phase
Context triple: [Fifth Crusade (planning phase), instanceOf, crusade planning phase]
  • A. military campaign phase chosen
    A military campaign phase is a distinct, time-bounded segment of a broader military operation characterized by specific objectives, actions, and resource allocations that contribute to the overall strategic goal.
  • B. Crusader state
    A Crusader state is a feudal polity established by Western European crusaders in the Eastern Mediterranean and surrounding regions during the medieval Crusades, maintained through military, religious, and political control over conquered territories.
  • C. papal military campaign
    A papal military campaign is an organized armed expedition initiated, sanctioned, or led by the pope or the Papal States to pursue religious, political, or territorial objectives.
  • D. staged attack
    A staged attack is a deliberately orchestrated and often deceptive assault designed to appear as a genuine, spontaneous, or externally initiated act of aggression.
  • E. climactic mission
    A climactic mission is the decisive, high-stakes undertaking at a story’s peak where characters confront their greatest challenges and the central conflict reaches its ultimate resolution.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69aed9626ebc8190a39de631788bea3e completed March 9, 2026, 2:29 p.m.
Created at: March 9, 2026, 3:44 p.m.