Triple

T4134222
Position Surface form Disambiguated ID Type / Status
Subject Samson gantry crane E85111 entity
Predicate instanceOf P0 FINISHED
Object gantry crane C14995 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: gantry crane
Context triple: [Samson gantry crane, instanceOf, gantry crane]
  • A. aerial lift
    An aerial lift is a mechanical device, such as a cable-suspended chair, gondola, or platform, used to transport people or materials above the ground, typically in construction, maintenance, or recreational settings.
  • B. movable bridge
    A movable bridge is a type of bridge with a deck or section that can be mechanically raised, lowered, rotated, or otherwise repositioned to allow the passage of water or land traffic beneath or through it.
  • C. vertical-lift bridge
    A vertical-lift bridge is a movable bridge whose central span rises vertically between two towers to allow river or maritime traffic to pass beneath while maintaining a level roadway.
  • D. cable car system
    A cable car system is a transportation network in which vehicles are pulled by continuously moving cables, typically used to move people or goods along steep or inaccessible routes such as mountainsides or urban hills.
  • E. elevator
    An elevator is a vertically moving transport device within a building that carries people or goods between different floors using a guided platform and mechanical lifting system.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69aed935ccd881909dc61f81bcdb7a78 completed March 9, 2026, 2:29 p.m.
Created at: March 9, 2026, 3:43 p.m.