Triple

T4126625
Position Surface form Disambiguated ID Type / Status
Subject Mayo Methot E92740 entity
Predicate end time of marriage with Humphrey Bogart P53981 FINISHED
Object 1945 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 1945 | Statement: [Mayo Methot, end time of marriage with Humphrey Bogart, 1945]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: end time of marriage with Humphrey Bogart
Context triple: [Mayo Methot, end time of marriage with Humphrey Bogart, 1945]
  • A. marriageEndWithElizabethTaylor
    Indicates that a marriage concluded with Elizabeth Taylor as one of the spouses.
  • B. endTime (marriage to Jaime de Marichalar)
    Indicates the time at which the marriage to Jaime de Marichalar officially ended.
  • C. endTime (marriage to Joséphine)
    Indicates the point in time at which the marriage to Joséphine legally or formally ended.
  • D. endTime (spouse: Ernest Hemingway)
    Indicates the point in time at which the subject’s spousal relationship with Ernest Hemingway ended.
  • E. marriageToCharlieChaplinEnd
    Indicates the point or event at which a marriage to Charlie Chaplin comes to an end (e.g., through divorce, annulment, or death).
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69aed9685f70819086932777aec8d959 completed March 9, 2026, 2:30 p.m.
NER Named-entity recognition batch_69af03a0f3408190adba7a8513bd3d12 completed March 9, 2026, 5:30 p.m.
PD Predicate disambiguation batch_69af01883b6c8190a482ead589a131a5 completed March 9, 2026, 5:21 p.m.
PDg Predicate description generation batch_69af039fb19c8190b20e62a3b3ad25c1 completed March 9, 2026, 5:30 p.m.
Created at: March 9, 2026, 3:41 p.m.