Triple
T4124235
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Jirón Carabaya |
E92685
|
entity |
| Predicate | locatedInTimeZone |
P109
|
FINISHED |
| Object | America/Lima |
E60001
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: America/Lima | Statement: [Jirón Carabaya, locatedInTimeZone, America/Lima]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: America/Lima Context triple: [Jirón Carabaya, locatedInTimeZone, America/Lima]
-
A.
America/Santiago
America/Santiago is the primary IANA time zone identifier used for the Santiago region of Chile, reflecting the country's standard and daylight saving time rules.
-
B.
Chile Standard Time
Chile Standard Time is the primary time zone used in central Chile, including regions such as Coquimbo, typically set at UTC−4 hours.
-
C.
America/El_Salvador
America/El_Salvador is the IANA time zone identifier representing local time in El Salvador, which observes Central Standard Time year-round without daylight saving changes.
-
D.
Peru Time
chosen
Peru Time is the standard time zone used throughout Peru, corresponding to UTC−05:00 without daylight saving time.
-
E.
Chile Summer Time
Chile Summer Time is the daylight saving time period used in Chile, during which clocks are advanced one hour to provide extended evening daylight compared to standard time.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69aed9685f70819086932777aec8d959 |
completed | March 9, 2026, 2:30 p.m. |
| NER | Named-entity recognition | batch_69af0208903c8190a7f451a455d3e253 |
completed | March 9, 2026, 5:23 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69b576b67fc881909d12481e61a07bf5 |
completed | March 14, 2026, 2:54 p.m. |
Created at: March 9, 2026, 3:41 p.m.