Triple

T4121120
Position Surface form Disambiguated ID Type / Status
Subject Wenceslas Square E92614 entity
Predicate instanceOf P0 FINISHED
Object urban boulevard C403 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: urban boulevard
Context triple: [Wenceslas Square, instanceOf, urban boulevard]
  • A. urban promenade
    An urban promenade is a designed public walkway or boulevard in a city, intended for leisurely strolling, social interaction, and visual enjoyment of the surrounding urban landscape.
  • B. urban plaza
    An urban plaza is a publicly accessible open space within a city, typically surrounded by buildings and streets, designed to support social interaction, circulation, and civic activities.
  • C. urban arterial road
    An urban arterial road is a high-capacity city street designed to carry large volumes of traffic efficiently between local streets and major highways while providing controlled access to adjacent land uses.
  • D. avenue chosen
    An avenue is a broad, often tree-lined street or thoroughfare designed to accommodate significant vehicular and pedestrian traffic within an urban or suburban area.
  • E. street
    A street is a public thoroughfare in an urban or suburban area, typically bordered by buildings, that facilitates vehicular and pedestrian movement and often supports various social and commercial activities.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69aed9685f70819086932777aec8d959 completed March 9, 2026, 2:30 p.m.
Created at: March 9, 2026, 3:41 p.m.