Triple

T4118952
Position Surface form Disambiguated ID Type / Status
Subject Mach principle E90362 entity
Predicate notFullyRealizedIn P29630 FINISHED
Object standard general relativity LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: standard general relativity | Statement: [Mach principle, notFullyRealizedIn, standard general relativity]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: notFullyRealizedIn
Context triple: [Mach principle, notFullyRealizedIn, standard general relativity]
  • A. notFullyIncorporated chosen
    Indicates that one entity has not been completely integrated, absorbed, or merged into another entity or system.
  • B. notGuaranteed
    Indicates that the specified outcome, condition, or obligation is not assured to occur or be fulfilled.
  • C. notClosedUnder
    Indicates that applying the operation or relation to elements of a set can produce results that do not belong to that set, so the set is not closed under that operation or relation.
  • D. notObservedIn
    Indicates that a particular entity, event, or property has not been detected, recorded, or seen within a specified context, dataset, or environment.
  • E. unfinished
    Indicates that an action, process, or state has started but has not yet been completed.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69aed95c080881908125e30c5dcdc6f8 completed March 9, 2026, 2:29 p.m.
NER Named-entity recognition batch_69af0246e40081908ad6741a830ca68e completed March 9, 2026, 5:24 p.m.
PD Predicate disambiguation batch_69af01867698819098e4144634b2ec4f completed March 9, 2026, 5:21 p.m.
Created at: March 9, 2026, 3:41 p.m.