Triple

T4115460
Position Surface form Disambiguated ID Type / Status
Subject Norfolk International Terminals E90279 entity
Predicate instanceOf P0 FINISHED
Object port terminal complex C12386 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: port terminal complex
Context triple: [Norfolk International Terminals, instanceOf, port terminal complex]
  • A. port authority
    A port authority is an organization responsible for managing, regulating, and developing a seaport or group of ports, including their infrastructure, operations, and related maritime activities.
  • B. port area chosen
    A port area is a designated coastal or riverside zone equipped with infrastructure and facilities for the berthing, loading, unloading, storage, and transfer of cargo and passengers between land and water transport.
  • C. seaport
    A seaport is a coastal facility equipped with harbors, docks, and infrastructure to enable the loading, unloading, storage, and transfer of cargo and passengers between sea and land transportation.
  • D. ferry terminal
    A ferry terminal is a designated facility where passengers and vehicles embark and disembark from ferries, typically providing ticketing, waiting areas, and docking infrastructure.
  • E. cross-border terminal
    A cross-border terminal is a transportation facility located at or near an international boundary that consolidates, processes, and transfers passengers or freight between different countries’ transport networks while handling customs, immigration, and regulatory controls.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69aed95c080881908125e30c5dcdc6f8 completed March 9, 2026, 2:29 p.m.
Created at: March 9, 2026, 3:41 p.m.