Triple
T4113157
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Boston campus |
E90223
|
entity |
| Predicate | hasFacility |
P105
|
FINISHED |
| Object |
Northeastern University Interdisciplinary Science and Engineering Complex
Northeastern University’s Interdisciplinary Science and Engineering Complex is a state-of-the-art research and teaching facility that supports collaborative work across engineering, science, and related disciplines.
|
E413422
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Northeastern University Interdisciplinary Science and Engineering Complex | Statement: [Boston campus, hasFacility, Northeastern University Interdisciplinary Science and Engineering Complex]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Northeastern University Interdisciplinary Science and Engineering Complex Context triple: [Boston campus, hasFacility, Northeastern University Interdisciplinary Science and Engineering Complex]
-
A.
MIT Building 54
MIT Building 54 is a prominent high-rise tower on the MIT campus that houses the Department of Earth, Atmospheric and Planetary Sciences and is known for its meteorological and geophysical research facilities.
-
B.
Malone Engineering Center
Malone Engineering Center is a major academic and research facility at Yale University that houses programs and laboratories in engineering and applied science.
-
C.
Bechtel Engineering Center
Bechtel Engineering Center is a major academic and administrative hub for the College of Engineering at the University of California, Berkeley, housing classrooms, labs, student services, and collaborative spaces.
-
D.
MIT Building 8
MIT Building 8 is one of the interconnected main academic buildings on the Massachusetts Institute of Technology campus, housing classrooms, laboratories, and offices along the central Infinite Corridor.
-
E.
MIT Building 20
MIT Building 20 was a famously makeshift World War II–era wooden structure at MIT that became an incubator for groundbreaking research and innovation across multiple disciplines.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Northeastern University Interdisciplinary Science and Engineering Complex Triple: [Boston campus, hasFacility, Northeastern University Interdisciplinary Science and Engineering Complex]
Generated description
Northeastern University’s Interdisciplinary Science and Engineering Complex is a state-of-the-art research and teaching facility that supports collaborative work across engineering, science, and related disciplines.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Northeastern University Interdisciplinary Science and Engineering Complex Target entity description: Northeastern University’s Interdisciplinary Science and Engineering Complex is a state-of-the-art research and teaching facility that supports collaborative work across engineering, science, and related disciplines.
-
A.
MIT Building 54
MIT Building 54 is a prominent high-rise tower on the MIT campus that houses the Department of Earth, Atmospheric and Planetary Sciences and is known for its meteorological and geophysical research facilities.
-
B.
Malone Engineering Center
Malone Engineering Center is a major academic and research facility at Yale University that houses programs and laboratories in engineering and applied science.
-
C.
Bechtel Engineering Center
Bechtel Engineering Center is a major academic and administrative hub for the College of Engineering at the University of California, Berkeley, housing classrooms, labs, student services, and collaborative spaces.
-
D.
MIT Building 8
MIT Building 8 is one of the interconnected main academic buildings on the Massachusetts Institute of Technology campus, housing classrooms, laboratories, and offices along the central Infinite Corridor.
-
E.
MIT Building 20
MIT Building 20 was a famously makeshift World War II–era wooden structure at MIT that became an incubator for groundbreaking research and innovation across multiple disciplines.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69aed95c080881908125e30c5dcdc6f8 |
completed | March 9, 2026, 2:29 p.m. |
| NER | Named-entity recognition | batch_69af01e06ce48190b840d931e44095ea |
completed | March 9, 2026, 5:22 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69b56b8adc748190be7b34ff37ae3618 |
completed | March 14, 2026, 2:07 p.m. |
| NEDg | Description generation | batch_69b56ca404d88190aad31ec27229cd40 |
completed | March 14, 2026, 2:11 p.m. |
| NED2 | Entity disambiguation (via description) | batch_69b56d908f3481908ff2c703983e84e3 |
completed | March 14, 2026, 2:15 p.m. |
Created at: March 9, 2026, 3:41 p.m.